EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
C-FMSL
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (18)
Airframe
- (4)
-
Final Inspection....
-
Weight and Balance
-
Wash Day
-
Getting closer to...
Avionics
- (2)
-
Fuel Flow Test
-
Pitot Static Test
Controls
- (1)
-
Flight Controls
Empennage
Engine
- (1)
-
Lycoming O-320 E2G...
Firewall
Fuel System
- (1)
-
Fuel Tanks, Pickups...
Fuselage
Inspection
Instrument Panel
- (1)
-
Original Panel / new...
Interior Finish
- (1)
-
Fabrication of...
Landing Gear
Lighting
- (2)
-
Landing gear
-
Navigation, landing...
Paint / Decals
Propeller
Research
Tail Feathers
Tools
Wings
Workshop
- (1)
-
Closing up the hangar
Doors
- (1)
-
Repair door latches
Cowl
- (1)
-
Cowl Paint
First Flight
- (2)
-
Propeller repitched
-
First Flight after...
Builder Name:
Mike Lamb
-
Project:
Bede - BD-4
-
VIEW REPORTS
Total Hours:
330
Total Flight Time:
0.9
Total Expense:
$3100.00
Start/Last Date:
Jan 05, 2017 - Mar 24, 2020
Engine:
Lycoming O-320 E2D
Propeller:
Experimental
Panel:
Standard 6 pack, duel IPads.
Friendly URL:
https://eaabuilderslog.org?s=C-FMSL
Home or Last Project Picture
Feb 16, 2020
Repair door latches
- (3 hours)
Category: Doors
Replaced connecting rod from front latch to rear latch, allowing pilot to open door without reaching behind for the original latch. Added return springs to front latches to make them return to closed position with ease.
Re adjusted the door handles. Re glued the interior trim on doors. Doors reinstalled.
B5D70B82-30CD-4AF2-83B2-31E5F02410A5.jpeg
B7861E95-0899-406A-89AB-3FCB93ABD6C6.jpeg
6D748F1A-BF30-48A6-AEFC-E88258B7724E.jpeg
C212B92C-42F9-436F-B7C5-05EF2B4BC14F.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.